New barn, restoration project begins.
May/18/08 12:00 Filed in: Barn In
Barnstead
We are doing some upgrades on this new home and
building a new barn.
Upgrades include modifications to the front porch, the inside stairway, the steps inside the garage and a side porch.
Upgrades include modifications to the front porch, the inside stairway, the steps inside the garage and a side porch.
|
Restoration Project for Roof Damage
Apr/20/08 16:10 Filed in: Structural
Failure in Concord
The barn is almost done.
Apr/10/08 15:55 Filed in: Pembroke
Barn Fire Restoration
Demolition complete, upgrades being added in.
Apr/09/08 16:01 Filed in: Greely
Street Water Damage
The demolition on Greely Street is done. The
owner has gone with a new and much needed upgrade
to the heating system. He has gone to forced hot
water from hot air oil - a big jump. He has also
had all the power rewired in the house - another
large upgrade as well. We are going back next
week to insulate an start the hanging drywall.
Soon it will be home sweet home!
Restoration project begins
Mar/26/08 20:24 Filed in: Greely
Street Water Damage
Fire restoration project begins
Mar/25/08 20:08 Filed in: Pembroke
Barn Fire Restoration
One section of this 3 horse stall barn was
destroyed by fire due to faulty wiring. Thank God
no animals perished in the fire. Today we began
demolition of that section of the building.
Within a week, this stall will be back up, with
power and water. When we are finished, you won't
even be able to tell that a fire occurred.
Owner's side is finished!
Mar/24/08 20:04 Filed in: Beacon
Street Fire Restoration
The sheetrock is in.
Feb/01/08 22:53 Filed in: Beacon
Street Fire Restoration
Subflooring & plumbing in.
Jan/22/08 22:56 Filed in: Beacon
Street Fire Restoration
Fire Restoration begins.
Sep/27/07 18:11 Filed in: Beacon
Street Fire Restoration
Beautiful hardwood flooring...completed in one day.
Aug/27/07 00:05 Filed in: New
flooring in Concord