Barn completed.

|

The barn is almost done.

Every thing is done on the stall except the tin roof and the power, which is set up to be done this week. All went well and the place cleaned up great!

|

Fire restoration project begins

One section of this 3 horse stall barn was destroyed by fire due to faulty wiring. Thank God no animals perished in the fire. Today we began demolition of that section of the building. Within a week, this stall will be back up, with power and water. When we are finished, you won't even be able to tell that a fire occurred.

|

The sheetrock is in.

This house has come a long way and is starting to shape up. The sheet rock is installed and ready for paint. The heating system is installed.



|

Subflooring & plumbing in.

The petitions are in and the sub-flooring is in. The shower units are installed and the plumbing is being installed by Progressive Mechanical. The walls were treated for smoke with Pro-block...

|

Level flooring, installation of support beams.

We have leveled the flooring and strapped the ceiling...

|

More exterior.

More exterior work including house wrap, window trim & siding.



|

Interior work begins.

Join Rick for a walk-through of the building as he reveals the status of the interior and points out some of the work that needs to be done.

|

Removed porch, reduced window openings.

The new hip-on-hip roof has been shingled, thanks to DME Construction.

We also removed the front porch and reduced the window openings.

|

Roof completed, exterior work.

Rick discusses exterior plans for the building. The new hip-on-hip roof has been installed. What an awesome job by DME Construction!


|

New roof installation.

DME Construction begins installation of new roof.


|

Fire Restoration begins.

Rick Bagley Contracting, LLP begins a new project restoring a home that was severely damaged by fire. The upper floors were badly damaged leaving a hole in the roof. We had to completely remove the roof on this house.

|