Restoration project begins.

This 3 year old home had a poorly framed roof system and could not handle the snow load. Clear your roof next season to prevent this or call us to make it right!

|

Barn completed.

|

The barn is almost done.

Every thing is done on the stall except the tin roof and the power, which is set up to be done this week. All went well and the place cleaned up great!

|

Demolition complete, upgrades being added in.

The demolition on Greely Street is done. The owner has gone with a new and much needed upgrade to the heating system. He has gone to forced hot water from hot air oil - a big jump. He has also had all the power rewired in the house - another large upgrade as well. We are going back next week to insulate an start the hanging drywall. Soon it will be home sweet home!

|

Restoration project begins

This home was flooded when pipes burst on the second floor due to a power outage. The restoration includes new sheet rock, flooring, ceilings and remodeling the kitchen and bath.

|

Fire restoration project begins

One section of this 3 horse stall barn was destroyed by fire due to faulty wiring. Thank God no animals perished in the fire. Today we began demolition of that section of the building. Within a week, this stall will be back up, with power and water. When we are finished, you won't even be able to tell that a fire occurred.

|

Owner's side is finished!

The owner's side of this duplex has been completed, and they have started moving in!

|

Paint, carpet & vinyl.

The owner's side of this duplex is almost finished. The second floor is complete, painted & carpeted. The first floor is painted and the kitchen vinyl floor installed. Only a few more weeks until this family can come home!


|