Garage Conversion Concord

This client had an attached two car garage that they wanted to convert to living space. They needed to add a guest bedroom, game room area, sports bar, and a 3/4 bathroom.

Work included:
• Floor pan framing and insulation
• Electrical & plumbing rework for wet bar and bathroom
• Drywall details
• Pocket doors



|

Ragged Mt. Vacation Home repair

This vacation home was destroyed by 3 heat lines that burst and caused major damage. The entire home was gutted and then restored with brand new interior, electric, heating systems and flooring.

|

Chichester repair.

This 140 + year old house had major rot problems due to a water tracking issue. We opened it up and found more damage than expected. After removing the siding, sheathing and insulation we discovered rotten framing.

We reframed it, installed new insulation, new sheathing and siding. We re-caulked it and prepped for paint. Notice the ice & water shield in the pics below. This was installed over the entire area to prevent this from happening again.

|

Structural Failure - Roof Damage

This 3 year old home in Concord was damaged due to the weight of the heavy snow. Make sure your roof is cleared off next winter - or call us to repair the damage!


|

New barn, restoration project begins.

We are doing some upgrades on this new home and building a new barn.
Upgrades include modifications to the front porch, the inside stairway, the steps inside the garage and a side porch.

|

Barn completed.

|

The barn is almost done.

Every thing is done on the stall except the tin roof and the power, which is set up to be done this week. All went well and the place cleaned up great!

|

Fire restoration project begins

One section of this 3 horse stall barn was destroyed by fire due to faulty wiring. Thank God no animals perished in the fire. Today we began demolition of that section of the building. Within a week, this stall will be back up, with power and water. When we are finished, you won't even be able to tell that a fire occurred.

|

Owner's side is finished!

The owner's side of this duplex has been completed, and they have started moving in!

|

The sheetrock is in.

This house has come a long way and is starting to shape up. The sheet rock is installed and ready for paint. The heating system is installed.



|

Subflooring & plumbing in.

The petitions are in and the sub-flooring is in. The shower units are installed and the plumbing is being installed by Progressive Mechanical. The walls were treated for smoke with Pro-block...

|

Fire Restoration begins.

Rick Bagley Contracting, LLP begins a new project restoring a home that was severely damaged by fire. The upper floors were badly damaged leaving a hole in the roof. We had to completely remove the roof on this house.

|

Beautiful hardwood flooring...completed in one day.

Looking to install a new hardwood floor? Call Rick Bagley Contracting.
|