We are here to rebuild a three year old home in Salem NH. The house was damaged due to a gas line failure. The cast gas line was the cause. After the demolition of the entire interior, the framing was removed and the remaining framing reworked. To prevent the smell of smoke, the house was treated with Problock a pigment based product. Now we are ready to re-plumb the house and move forward.
Every thing is done on the stall except the tin roof and the power, which is set up to be done this week. All went well and the place cleaned up great!
One section of this 3 horse stall barn was destroyed by fire due to faulty wiring. Thank God no animals perished in the fire. Today we began demolition of that section of the building. Within a week, this stall will be back up, with power and water. When we are finished, you won't even be able to tell that a fire occurred.
The owner's side of this duplex is almost finished. The second floor is complete, painted & carpeted. The first floor is painted and the kitchen vinyl floor installed. Only a few more weeks until this family can come home!
|
The sheetrock is in.
Feb/01/08 22:53
This house has come a long way and is starting to shape up. The sheet rock is installed and ready for paint. The heating system is installed.
The petitions are in and the sub-flooring is in. The shower units are installed and the plumbing is being installed by Progressive Mechanical. The walls were treated for smoke with Pro-block...
Rick Bagley Contracting, LLP begins a new project restoring a home that was severely damaged by fire. The upper floors were badly damaged leaving a hole in the roof. We had to completely remove the roof on this house.